The cost of concrete in a structure includes the cost of all of the following EXCEPT:
5. Question 5 The cost of concrete in a structure includes the cost of all of the following EXCEPT: 1 / 1 point Aggregate Water Price of Gas Equipment…
5. Question 5 The cost of concrete in a structure includes the cost of all of the following EXCEPT: 1 / 1 point Aggregate Water Price of Gas Equipment…
4. Question 4 Cut and Fill equipment include all of the following except 1 / 1 point Soil Compactor/Roller Excavator Wheel Tractor-Scraper Dump Truck Backhoe
2. Question 2 A cost estimator would use measurement to 1 / 1 point take off quantities from detail drawings to produce a bill of quantities for bid purposes calculate the…
6. Question 6 Typical uses of construction caissons include (Check all that apply): 1 / 1 point Taller buildings Construction over water Building on a landfill Poor soil conditions
3. Question 3 The purpose of measuring any building is to establish the correct amount of work to be carried out. This involves producing accurate quantities that are (Check all…
1. Question 1 Measurement is important because (Check all that apply): 1 / 1 point Effective procurement aims to provide clients with projects that achieve good value for money Key objectives…
7. Question 7 When calculating concrete takeoff, it is important to convert from ft3 to CY 1 / 1 point True False
5. Question 5 Cut and Fill Software helps with analysis of land and conditions present on site. 1 / 1 point True False
4. Question 4 What is the total cost of the new building including storage in 2016 ? 1 / 1 point $5,383,256 $6,300,034 $7,600,546 $5,057,916 Total Cost of…
3. Question 3 What is the cost of the storage facility in 2016 ? 1 / 1 point $ 320,000 $ 363,228 $ 403,620 $ 281,916 For…