The Validation Process for cost results in documented Conditions of Satisfaction, based upon:

7. Question 7 The Validation Process for cost results in documented Conditions of Satisfaction, based upon: 1 / 1 point   Detailed Cost Estimate   Value Proposition and Information Index   Problem Statement…

Construction Cost Estimating and Cost Control | Online Course Support

The Owner’s Value Proposition may be analyzed to provide guidance to the Design and Construction team regarding:

6. Question 6 The Owner’s Value Proposition may be analyzed to provide guidance to the Design and Construction team regarding:   1 / 1 point   Required Function   Preferred Architectural Form  …